Case Studies

EnglishX

OPEN BIM Healthcare Design by LINK arkitektur

LEARN HOW BIM helps clients to understand and follow the design process; an information database connected to BIM elements makes the requirement and specification workflows easier; OPEN BIM can save time and money for the ...

"We get an insight into the minds of architects, designers and construction companies"

Brazilian manufacturer Incepa, part of Roca Group, started publishing their products in the BIMobject® Cloud in August 2017. Incepa, located in Paraná, is one of the oldest companies in Brazil providing complete solutions for coating ...

CFD Analysis for the Industrial Ventilation

The goal of analysis was to analyse air system for a factory shed in order to provide comfortable environment for workers inside and also achieve the necessary requirements of process in specific areas in terms ...


Case Study: HVAC Analysis of an Operating Room

Controlling contamination in the hospital operating room environment is vital for the safety of patients and hospital personnel, and in this article we assess how computational fluid dynamics is helping architects and engineers to better ...

AECOM experiences substantial time savings on lighting design using MagiCAD for Revit

AECOM recently used MagiCAD software to assist with the electrical design on a hospital building project located in the UK, enabling the MEP designers to deliver the lighting design six weeks early.

Zahner & SOM’ AEC Hackathon Experience

Zahner and Skidmore, Owings & Merrill (SOM) were invited to participate in the 2017 Dassault Systèmes’ Design in the Age of Experience AEC Hackathon earlier this year.

BIM Academy - Smart Connected Buildings

By way of update to an ongoing project that considers data collection and analysis in terms of social housing, here again is Graham Key (BIM Academy) to outline their latest initiatives when it comes to ...

BIM Academy – Durham Cathedral

With the estates team at Durham Cathedral seeking to apply digital solutions to improve the curation and management of this 900-year-old World Heritage Site, here is Graham Key (BIM Academy) to tell us just how ...

2D to 3D BIM conversion and how to utilize BIM models for Vinata project

Vinata Tower includes 24-storey and 2 basements with 23.387 m2, the apartment building is the pilot to use comprehensive BIM. This is the first project Vinata apply BIM to realize the benefit of BIM and ...

Future Testing for Fabricators

With Future Testing, fabricators can leverage design automation to quickly create detailed, precise models using specialist tools to simplify complex design processes like sheet metal bending or pipe routing.