Case Studies

SolibriX

Advanced BIM Modeling Made It Possible

Advanced BIM Modeling Made It Possible to construct a 65.000/117.000 m2 commercial building complex, the Statoil building at Fornebu, Norway, in only 20 months on site.

Interoperability testing: IFC2x3 site geometry exchange

In the previous blog post we looked at a case study of our Cleveland Fire Brigade Training and Administration Building. An issue that emerged from this project was to do with how our site geometry ...