Easton Helsinki, Fully Integrated BIM Design

Lahdelma & Mahlamäki Architect's Easton Centre has been pushing the boundaries of integrating BIM into its workflow – it has been as much about process as it has about the final result.

DZK (Danzigerkade) Building in Amsterdam

"Synchro has helped our clients to see and realize the complex construction process, time management, material and cash flow management along with efficient site logistics." -- Deepak Shah, Executive Director -- Projects and Process, 3D ...

Crate & Barrel: An Owner's Use of BIM/VDC

John Moebes, AIA NCARB Directore of Construction & Design

Oy Alfred A. Palmberg Ab - Varma Salmisaari Project, Finland

Vico Software’s Virtual Construction™ Services team provided the Palmberg Group, the Salmisaari project's general contractor, a detailed, highly accurate, model-based estimating, optimized location based project schedule, and an in-depth constructability analysis report.

The Place, London Bridge Quarter

Located at the heart of London Bridge Quarter, The Place has direct access to a new piazza and the extensive transport connections at London Bridge Station.

Autodesk Headquarters for AEC

A New England commercial interiors project breaks new ground with integrated project delivery.

Autodesk AEC Headquarters and Integrated Project Design

In 2008, Autodesk Inc. decided to design a new headquarters in Waltham, Mass., using a new approach to save money, time, and meet all of its building goals.

The Structural Geometry of The Pinnacle

Columns spaced around the main tower will be linked together structurally by a set of braces forming the stability system.