Case Studies

BIM SoftwareX

BIM implementation in The New Alamein City - Egypt

The New Alamein City is considered the first model of the new Generation of the millennium cities, its estimated cost 6.000.000.000 EGP, the area of the project 50.000 acres.

OPEN BIM Healthcare Design by LINK arkitektur

LEARN HOW BIM helps clients to understand and follow the design process; an information database connected to BIM elements makes the requirement and specification workflows easier; OPEN BIM can save time and money for the ...

Case Study: HVAC Analysis of an Operating Room

Controlling contamination in the hospital operating room environment is vital for the safety of patients and hospital personnel, and in this article we assess how computational fluid dynamics is helping architects and engineers to better ...

AECOM experiences substantial time savings on lighting design using MagiCAD for Revit

AECOM recently used MagiCAD software to assist with the electrical design on a hospital building project located in the UK, enabling the MEP designers to deliver the lighting design six weeks early.

2D to 3D BIM conversion and how to utilize BIM models for Vinata project

Vinata Tower includes 24-storey and 2 basements with 23.387 m2, the apartment building is the pilot to use comprehensive BIM. This is the first project Vinata apply BIM to realize the benefit of BIM and ...

Figure 1. Bridge showing contours of tensile stress along the axis. The tensile stress gets generated due to live load from the train.

Simulation for Bridges

Starting with a Dassault Systemes’ CATIA® model, one can use physics apps on the 3DEXPERIENCE platform to create simulation models and perform analyses for events such as the movement of trains on bridge decks.

Semple & McKillop save time and ease workflow with BIM strategy and MagiCAD for Revit software

Semple & McKillop MEP engineering consultancy has adopted MagiCAD to achieve a BIM project workflow.

Power Generation Projects in China Leverage Bentley’s Comprehensive Modeling Environment for BIM

Over the past several years, Bentley’s multi-discipline comprehensive modeling environment has been used across China for the widest possible range of power generation projects including fossil fuels plants, nuclear power stations, hydropower plants, pumped storage ...

“Future Testing” for Civil Engineering - SMEDI Case Study

Traditionally, engineering firms review the architect’s conceptual designs and independently develop their engineering drawings. This is a wasteful step, which duplicates work and can misinterpret the architect’s intent.

BIM Strategy on Russian Production Facility (Bentley)

Bentley’s Interoperable Software Reduces Design Time by 25 Percent