Case Studies

BIM ServicesX

Case Study: HVAC Analysis of an Operating Room

Controlling contamination in the hospital operating room environment is vital for the safety of patients and hospital personnel, and in this article we assess how computational fluid dynamics is helping architects and engineers to better ...

MEP BIM Case study - Honda-Toyota Showroom

The Honda-Toyota facility project in Seattle required Advenser to model, coordinate and use this model for all other future showrooms.

Point Cloud BIM Case study

This project had a requirement for creation of As built BIM model of the building as well as the surrounding terrain and the fences on both sides width wise. The exterior as well as the ...

MEP BIM model- Residential & Commercial Building

This MEP BIM model project consisted of modeling, clash detection and preparation of coordinated drawings for all architectural, structural, mechanical, plumbing and electrical components for all floors of the building.

http://thebimhub.com/en/2014/07/28/case-study-hospitals-can-save-up-to-225000-per-yea/

BIM for Facility Management

Maine General Medical Center, YouBIM & IBM Maximo Integration. Tie YouBIM into the IBM Maximo environment, one of the most widely deployed CMMS solutions that helps manage every aspect of facility management.  

The Place, London Bridge Quarter

Located at the heart of London Bridge Quarter, The Place has direct access to a new piazza and the extensive transport connections at London Bridge Station.