BIM implementation in The New Alamein City - Egypt

The New Alamein City is considered the first model of the new Generation of the millennium cities, its estimated cost 6.000.000.000 EGP, the area of the project 50.000 acres.

OPEN BIM Healthcare Design by LINK arkitektur

LEARN HOW BIM helps clients to understand and follow the design process; an information database connected to BIM elements makes the requirement and specification workflows easier; OPEN BIM can save time and money for the ...

2D to 3D BIM conversion and how to utilize BIM models for Vinata project

Vinata Tower includes 24-storey and 2 basements with 23.387 m2, the apartment building is the pilot to use comprehensive BIM. This is the first project Vinata apply BIM to realize the benefit of BIM and ...

Easton Helsinki, Fully Integrated BIM Design

Lahdelma & Mahlamäki Architect's Easton Centre has been pushing the boundaries of integrating BIM into its workflow – it has been as much about process as it has about the final result.

Zaha Hadid Architects: The Danjiang Bridge

Zaha Hadid conclusion was that this project process with engineering data on the cloud resulted in a highly enhanced profit margin if compared to using a conventional process of a file-based approach.

BIM in the Abu Dhabi International Airport Midfield Terminal Building (Part 2)

The complexity of the Midfield Terminal Building project posed many challenges to the general contractor prior to and during construction. Mitigating these challenges, ensuring the quality of the finished product and meeting the stringent demands ...

BIM in the Abu Dhabi International Airport Midfield Terminal Building (Part 1)

The Midfield Terminal Building of the Abu Dhabi Airport (MTB-ADIA) is a $3 billion, 700,000 square-meter development, providing a terminal building with passenger and cargo facilities, duty-free shops and restaurants for a total capacity of ...

“Future Testing” for Civil Engineering - SMEDI Case Study

Traditionally, engineering firms review the architect’s conceptual designs and independently develop their engineering drawings. This is a wasteful step, which duplicates work and can misinterpret the architect’s intent.

Aqua+ Increases Plant Control System Design Speed by 50% (Bentley)

Khabarovsk Vodocanal plans to repurpose the unique engineering of the Tunguska Groundwater Intake Facilities for use at underground water treatment facilities in other areas, ensuring the benefits of advanced technology and engineering are realized throughout ...

United Utilities Adopts Collaborative BIM Strategy (Bentley)

With all four of its construction delivery partners adopting a BIM strategy for construction delivery projects under the AMP6 program, United Utilities is focusing its efforts on expanding the BIM approach to obtain buy-in from ...