OPEN BIM Healthcare Design by LINK arkitektur

LEARN HOW BIM helps clients to understand and follow the design process; an information database connected to BIM elements makes the requirement and specification workflows easier; OPEN BIM can save time and money for the ...

2D to 3D BIM conversion and how to utilize BIM models for Vinata project

Vinata Tower includes 24-storey and 2 basements with 23.387 m2, the apartment building is the pilot to use comprehensive BIM. This is the first project Vinata apply BIM to realize the benefit of BIM and ...

Zaha Hadid Architects: The Danjiang Bridge

Zaha Hadid conclusion was that this project process with engineering data on the cloud resulted in a highly enhanced profit margin if compared to using a conventional process of a file-based approach.

BIM in the Abu Dhabi International Airport Midfield Terminal Building (Part 2)

The complexity of the Midfield Terminal Building project posed many challenges to the general contractor prior to and during construction. Mitigating these challenges, ensuring the quality of the finished product and meeting the stringent demands ...

BIM in the Abu Dhabi International Airport Midfield Terminal Building (Part 1)

The Midfield Terminal Building of the Abu Dhabi Airport (MTB-ADIA) is a $3 billion, 700,000 square-meter development, providing a terminal building with passenger and cargo facilities, duty-free shops and restaurants for a total capacity of ...

1. Data imaging of main hall

BIM and the G20 Meeting Hall

When the 2016 G20 summit was planned to be held at the Hangzhou International Expo Center, Zhejiang YASHA Co., Ltd. took on the major project for the core meeting area.

How Can BIM Software Locate Bridge Faults?

Powered by the 3DEXPERIENCE platform, CATIA & ENOVIA applications help to vastly improve speeds on Chengdu’s Second Ring Road.

Keeping up with the schedule and progress on site

This study summarises details of a first phase implementation of Riqq MashUP and the benefits realised by the project manager and client. As the study relates to a live project, the client has requested that ...