Case Studies

United StatesX

Scan to BIM for a Residential project

This is a case study on a project of Point Cloud to BIM services (also known as Scan to BIM services) for residential buildings that Tesla has successfully accomplished. It will provide an insight into ...

AECOM experiences substantial time savings on lighting design using MagiCAD for Revit

AECOM recently used MagiCAD software to assist with the electrical design on a hospital building project located in the UK, enabling the MEP designers to deliver the lighting design six weeks early.

Credit: Murray Company

Murray Company enjoys the powerful benefits of iConstruct across portfolio of projects

Read on to know how Murray Company is enjoying the powerful benefits of iConstruct across portfolio of projects

Clark Construction Group embraces the power of iConstruct for Virtual Design and Construction

Find out how iConstruct was utilized in Clark Construction Group projects.

BIM Case study Google Kirkland Phase II

Our scope was to create an intelligent BIM with LOD 400 of HVAC and plumbing services from the 3D scanned point cloud data of the building.

MEP BIM Case study - Honda-Toyota Showroom

The Honda-Toyota facility project in Seattle required Advenser to model, coordinate and use this model for all other future showrooms.

Harnessing the Power of Cloud-Based Collaboration on an Architecture Project

When working remotely, with many variables and tight tolerances, here’s how SHoP Architects maintains a high level of control and coordinates with the fabricator and the construction site, both thousands of miles away from New ...

Point Cloud BIM Case study

This project had a requirement for creation of As built BIM model of the building as well as the surrounding terrain and the fences on both sides width wise. The exterior as well as the ...

Centre Hospitalier de l’Universite de Montreal, CannonDesign + NEUF Architect(e)s

Tackling North America’s Largest Healthcare Project in Seven Steps

The $1.5 billion University of Montreal Health Centre required CannonDesign and NEUF Architect(e)s to innovate their technologies and protocols.

Ryan Companies – Marina Heights, “Synchro + Lean = Predictable Outcome”

Ryan Companies embarked on a long-term top tier new office campus development in Tempe, AZ. This project came along at a perfect time at Ryan where processes, technologies, and old ways of doing things were ...