BIM Requirements for LOD 400 and LOD 500


BIM Requirements for LOD 400 and LOD 500

The level of Development characterizes the level of fulfillment of which model components or elements are produced. The LOD phrasing is gotten from the American Institute of Architects Document E203-2012, Building Information Modeling Protocol Exhibit.

These dynamic levels help characterize steady desires of the content make-up through the building lifecycle. Here are two described LOD depictions as laid out in the AIA modeling protocol.

It helps architects to investigate a few building components like spatial connections, Building Geometry, Lighting examination, Building properties and Geographic data. BIM encourages subcontractors to work together successfully through clash or 'conflict detection' among structural, architectural and MEP parts and build up a coordinated 3D model. ACCRID BIM projects, illustrates the practical example of how the implementation of LOD 300 and 400 have been benefiting the overall development of the projects.  

LOD 400

The Model elements are modeled as particular gatherings exact as far as amount, size, shape, area, and introduction, with complete fabrication, assembly, and detailing information. Non-geometric data may likewise be connected to model elements. This level of improvement is considered to be reasonable for the fabrication and assembly. LOD 400 components are destined to be utilized by specialty trade contractors and fabricators. We give fabrication/shop drawings in PDF format and furthermore speak to LOD 400 model for coordination and fabrication purposes.


LOD 500

The Model elements are modeled as built congregations, for instance, exact as far as amount, size, shape, area, and introduction. Non-geometric data may likewise be joined to model elements. The last level of development speaks to information as constructed including as-built conditions. LOD 500 components will incorporate finished parameters and qualities point by point in the owners BIM deliverable determination. LOD 500 as-built models demonstrate the present circumstances, and as-built schedules according to customers demand. We give as built drawings in pdf format.

Advantages of LOD BIM:

  • Gets thoughts of what is to be utilized as a part of a particular phase of a BIM designing process
  • Gives finish understandings of every stage
  • Helps to make legitimate outline and arranging of each LOD stages
  • BIM LOD detail has empowered isolation of the entire BIM displaying and configuration to prepare for different levels. Is has helped in appropriating the workload and facilitate the path for Engineers, Modelers and other approve experts.

The LOD give methods where architects, owners, engineers, and designers can characterize the desires and deliverable prerequisites for a project. The LOD, combined with other project documentation, gives a technique by which colleagues can impart all the more adequately and plainly to characterize extend objectives and obligations – prompting to a more efficient project.

Here role of BIM experts is extremely important to make sure what LOD elements are required by client and for what purpose the BIM model will be used in this regard ACCRID BIM is one of the BIM Experts to adjust to Level of Development (LOD - 400 and 500) with express condition of clarity and steadfastness. These headway models are reason worked for various phases of configuration, on-site production control, design, construction-caliber quantities, 3D visualization, estimations, scheduling, and fabrication.

The LOD structure empowers viable and exact arranging and following of a few aspects of the project delivery process. These reason assembled models will henceforth allow you to increase better control over projects, streamline work processes and increment profitability.

Thanks for reading!