Case Studies

Integrated BIM Case study - Imperial Avenue Residential & Commercial Tower

Posted by

Project information

Building Type : Residential & Commercial

Location         : Dubai, UAE

Total Area      : 13,40,000 Sq Ft

Inputs             : BIM Design drawings

Deliverables   : BIM Shop drawings, 4D, 5D & 6D

Software         : Revit 2016

Services         : Architectural, Structural & MEP

Our scope of services

The Proposed Residential Development is comprised of 40 storey tower, which sits tall over a distinct 5 storey podium base (G+M+4 Podiums) which acts as the base for the tower. The health club level houses the swimming pool, gymnasium, landscaped gardens with an exclusive jogging track and health & leisure facilities. The parking, inclusive of visitors parking, is distributed throughout the mezzanine and 4 podium levels for the residents benefit.


Our scope of work in the project was 3D, 4D, 5D and 6D stagesBIM Modeling was accomplished using Revit whereas co-ordination and clash detection were carried out using Navisworks Manage as well as Revit. Inputs received for the project included design drawings in CAD. 3D models for all elements were developed from the design drawings for coordination which was then coordinated with the Architectural and structural 3D model. Conflicting spatial data in the model that could not be resolved by the team was notified to the client through written RFI highlighting the location of the conflict. The Issues were tracked using Issue tracker. Our BIM coordinator at client’s site conducted weekly coordination meetings; issues were discussed and solved. Coordinated set of MEP fabrication drawings along with BOQ were submitted to the client as final deliverables. The same BIM model will be used for Facility Management purpose.

Thanks for reading!

Please enjoy a limited number of articles over the next 30 days.

For total access log in to your The BIM Hub account. Or register now, it's free.

Register Sign in


You might also like