The Project: Design a New Slab at the Lobby Bar. 

The Workspace: Adding a new slab above a high-ceilinged meeting space to complete the lobby bar would require changes to the building’s plumbing, pipes, and mechanical equipment.

The Challenge: To minimize disruption to the hotel, we did not have the luxury of tearing open the building to assess the structure, nor did we have the option of operating during daytime hours.