McGraw-Hill BIM Report | Project Delivery Systems

 

Documents

Document downloads are only available to registered members. Click here to sign in.

If you have not created an account yet, then please sign up first.

November 07, 2014 by http://bradleybim.com/

Excerpts:

Design-Bid-Build: 38% of architects and 22% of contractors find this to be the best system to reduce project cost.

Design-Build: 43% of architects and 50% of contractors find this to be the best system to reduce project schedule, and a higher percentage of owners using this method report projects finishing ahead of schedule than with the other two systems.

Construction Management at Risk: A higher percentage of owners doing projects that employ this system find that their projects are under budget (33%) and 60% report being very satisfied with the projects they have conducted, which is at least 20 percentage points higher than those using design-bid-build or design-build.

Thanks for reading!

Please enjoy a limited number of articles over the next 30 days.

For total access log in to your The BIM Hub account. Or register now, it's free.

Register Sign in